Re-roofing · London
Roofing
When repairs stop making sense, we strip the roof back and rebuild it properly — membrane, battens, covering and details.
What we do
A re-roof is one of the biggest jobs a house will need, and one of the most important to get right. We strip the old covering, check and repair the timbers underneath, lay a new breathable membrane, set out new battens and re-cover the roof in slate or tile.
The details are where roofs fail, so they get the most attention: ridges, hips, verges, valleys and the junctions with chimneys and walls.
Natural or fibre-cement slate, laid to true lines and gauge.
Clay or concrete tiles, including dry-fix ridges and verges.
New breathable underlay and treated battens set out to gauge.
Rotten or damaged rafters and fascia boards replaced.
Roof ventilation to reduce the risk of condensation.
Flashings and weathering to chimneys and walls.
Every re-roof we do follows the same order, because each stage depends on the one before it.
Renewing more than a quarter of a roof usually counts as notifiable work under the Building Regulations, mainly because of the rules on insulation and ventilation. We will tell you at survey stage whether your re-roof needs to go through Building Control and coordinate it where it does.
If you live in a conservation area or a listed building, the choice of materials may also be restricted. We will check before you commit to anything.
Our recent roofing work includes a full slate re-roof on a London terrace and a re-roof in Lambeth, where the roof was rebuilt from the membrane up. You can see both in our projects.
Related projects
Questions
Anything else? Call 020 8050 2887 or send us a message.
Isolated problems — a few slipped slates or a failed flashing — can usually be repaired. Widespread slipped or porous slates, failed underlay, or repeat leaks in different places usually mean a re-roof is better value. We will show you photos and explain our reasoning.
Typically one to two weeks for a terraced or semi-detached house, depending on access, roof size and weather.
Often, yes, if more than 25% of the roof is being renewed. We advise on this at survey and coordinate it where needed.
Yes. A re-roof is carried out from the outside. The roof is kept weathertight at the end of each working day.
One team, the next trade
Free quotes · No obligation
Speak to Swift Fix about your building, roofing or refurbishment project. Free, no-obligation quotes across London and Kent.