Bathroom renovation
Refurbishment & interiors
From rip-out to final installation — waterproofed properly, tiled straight and finished to last.
What we do
A good bathroom is mostly about what you cannot see. We strip back to sound surfaces, renew pipework where needed and fully tank shower areas and wet rooms before a single tile goes on. Shower trays and wet room formers are set with the right falls, ventilation is sized properly and every edge is finished cleanly.
From rip-out to final installation, Swift Fix takes care of the entire bathroom from start to finish.
Complete strip-out and rebuild, with a new layout if needed.
Compact rooms planned for storage and ventilation.
Tanked, with correct falls to the drain.
Large-format, marble-effect and feature tiling.
New pipework, wastes, showers and sanitaryware.
Vanity units, radiators, lighting and accessories.
We survey the space, confirm the layout and finishes, and give you a free, itemised quote and schedule.
Electrical work in bathrooms is subject to special rules on zones and IP-rated fittings, and new circuits in a bathroom are notifiable under the Building Regulations. Extractor fans must be sized for the room. Where layout or structural changes are planned, we coordinate Building Control.
Related projects
Typically two to three weeks for a like-for-like renovation, and three to four weeks with layout changes or full tiling.
We sequence the work to keep at least one WC usable wherever possible.
Either. We can supply specified sanitaryware and tiles, or fit items you have chosen after checking compatibility.
We tank showers and wet rooms, use backer boards, set correct falls to drains and seal every penetration.
One team, the next trade
Free quotes · No obligation
Speak to Swift Fix about your building, roofing or refurbishment project. Free, no-obligation quotes across London and Kent.